Normal Switching Operation Procedure The first step in the normal operation of a switching process involves proper communication and preparation. Here's how it should be carried out: 1. The management team must inform the operation group of the specific area affected by the power shutdown and re-energization at least two days in advance. This includes details about transformer operations, such as which ones will be turned off or activated. 2. Upon receiving the notification, the operation team is expected to complete the following tasks within one day: (1) Immediately contact the electrical professionals to arrive on-site and assess whether the load distribution is feasible. (2) If the situation is not feasible (i.e., does not meet safety standards), report this immediately and provide clear reasons for the non-compliance. (3) If the plan is feasible, clarify the time and scope of the power outage and re-energization. Once the operation table is completed, it must be reviewed and approved by the relevant leaders before being officially communicated to the management office in writing. 3. The management office will post the "Power Failure Notice" one day prior to the scheduled operation. 4. Before the actual switch operation, the personnel should prepare accordingly. For example, elevators should be lowered to the ground floor, and if necessary, the generator’s switch should be placed in the off position. 5. Under the supervision of a guardian, the operator should execute the "Power Failure Notice" as instructed. 6. After completing the switch operation, the operator must check the elevator’s functionality and ensure that the generator’s switch is set to the automatic position. 7. All activities and actions taken during the process must be thoroughly documented. Emergency Barge Operation Procedure 1. In case of an emergency, such as detecting smoke, short circuits, or a major incident like a fire in the power distribution room, the operating staff has the authority to immediately perform a partial or full power shutdown. They should quickly disconnect the low-voltage power distribution cabinet or the high-voltage switch in the high-voltage cabinet. 2. As soon as the power is cut off, the management office and maintenance personnel must be notified immediately. Upon arrival, the maintenance team will investigate the cause of the incident and restore power gradually once the issue is identified. Damaged components should be repaired promptly, and normal power supply should be restored as soon as possible. At the same time, the fire center should use the broadcast system to explain the reason for the power outage to the residents. 3. All incidents must be recorded thoroughly. In the case of major emergencies, the incident should be reported immediately to the superior supervisor for further action. This detailed procedure ensures safety, compliance, and efficient handling of both routine and emergency power operations.
Chinese Tier 1 brand Solar Panel (Longi, Jinko, Trina, Canadian, Ja etc.)
This type of product is mainly Tier 1 solar module product in China, include Longi solar panel. Jinko solar panel, Canadian Solar panel, ja solar panel etc.all of which are among the top 10 world-renowned brands. The original A grade product is mainly mono crystalline and half cut cell solar modules, with a power range of 400watts to a maximum of 700watts.quality warranty is 25 years.
A grade, this type of film is characterized by a neat and uniform appearance, printed electrode grid lines, no broken grid, no surface stains, no leakage, no aluminum package, no hidden cracks, no scratches, no black core, no reverse current, stable electrical performance, and high conversion efficiency
Chinese tier 1 brand solar panel
Tier 1 Solar Panel,Mono Solar Panel N Type,Solar Panels Bifacial 555 Watt,Solar Panel Mono Topcon Cell PLIER(Suzhou) Photovoltaic Technology Co., Ltd. , https://www.pliersolar.com
Using solar cell testing equipment to measure and screen, the conversion efficiency, filling factor, and appearance that meet certain standards are first level. Generally, the conversion efficiency, filling factor, and appearance of first level are better than those of level B
The level of solar panels can be divided into first level, second level, third level, and fourth level, and the first level components can be divided into first level+and first level - two levels. The second level is also the same, and the cost difference between different levels of solar panels is also very large.
TIER 1 brand include
Longi, Jinko, Trina, JA, Canadian, znshine, etc.
quality warranty
25 years
grade
original A grade (each solar panel can be checked on official website with barcode)
power range
400watt to max 700watt